top of page

CONSTRUCTION PACKAGES

At HOME DEVELOPERS, every project, be it full construction, an added floor, or room extension, receives unwavering attention and customer-centric priority. Our commitment to quality ensures lasting excellence and minimal maintenance. Experience a construction journey with exceptional post-care services, transforming your vision into reality with attention to detail and satisfaction in every phase.

Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting 
Electrical
Plumbing
CP Fittings
Considered Basic Prices 
Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting
Electrical
Plumbing
CP Fittings
Considered Basic Prices 
Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting
Electrical
Plumbing
CP Fittings
Considered Basic Prices 

*     All the plans are exclusive GST

**  The rates are applicable only if the soil bearing capacity of site is (sbc)< 160. If it is less than that additional charges will apply

*** These plans are general guidelines not actual quotation, the actual quotation will be provided based on structural, architectural drawings.

​​

​

  • Any additional costs associated with the construction of the elevation layout shall be borne by the client.

  • The construction of rain water harvesting pit and percolation pit shall be an additional cost.

  • The cost of water pumps, Auto water level controller, solar water heater etc., shall be extra.

  • If required, the cost of security grills shall be extra.

  • The cost of light fittings, chimney, and landscaping shall be extra.

  • Stone slabs over the front storm water drain are not included in the plan.

  • Any deviation from the architectural, structural, plumbing, and electrical drawings shall be treated as extra work and charged accordingly.

EXCLUSIONS :

​​

​

  • All departmental approvals, liasoning works  & neighbors objections has to be handled by the client.

  • Earthwork excavation is taken into account of hard soil, if encountered by rock or loose soil additional charges will apply.

  • Sloped roof will be charged 125% of basic rate of the plan.

  • Staircase if outside roof & headroom  will be charged 60% of buildup area.

  • Basic price means landed cost of the material at site (which includes tax, transportation loading and unloading etc.).

  • Curing of any item will be done for maximum for 7 days except for the roof which will be for 15 days.

  • Designs & drawings to be free with the provision for correction twice. After which INR 50 per sft would be charged on super built area.

TERMS & CONDITIONS

Discover the power of tailored construction with us. Contact for personalized solutions that prioritize quality over pricing. Your project, your vision – let's build a custom narrative of enduring excellence together.

bottom of page