CONSTRUCTION PACKAGES
At HOME DEVELOPERS, every project, be it full construction, an added floor, or room extension, receives unwavering attention and customer-centric priority. Our commitment to quality ensures lasting excellence and minimal maintenance. Experience a construction journey with exceptional post-care services, transforming your vision into reality with attention to detail and satisfaction in every phase.
Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting
Electrical
Plumbing
CP Fittings
Considered Basic Prices
Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting
Electrical
Plumbing
CP Fittings
Considered Basic Prices
Designs & Drawings
Structure
Flooring
Kitchen
Bathroom
Doors & Windows
MS Works
Painting
Electrical
Plumbing
CP Fittings
Considered Basic Prices
* All the plans are exclusive GST
** The rates are applicable only if the soil bearing capacity of site is (sbc)< 160. If it is less than that additional charges will apply
*** These plans are general guidelines not actual quotation, the actual quotation will be provided based on structural, architectural drawings.
​​
​
-
Any additional costs associated with the construction of the elevation layout shall be borne by the client.
-
The construction of rain water harvesting pit and percolation pit shall be an additional cost.
-
The cost of water pumps, Auto water level controller, solar water heater etc., shall be extra.
-
If required, the cost of security grills shall be extra.
-
The cost of light fittings, chimney, and landscaping shall be extra.
-
Stone slabs over the front storm water drain are not included in the plan.
-
Any deviation from the architectural, structural, plumbing, and electrical drawings shall be treated as extra work and charged accordingly.
EXCLUSIONS :
​​
​
-
All departmental approvals, liasoning works & neighbors objections has to be handled by the client.
-
Earthwork excavation is taken into account of hard soil, if encountered by rock or loose soil additional charges will apply.
-
Sloped roof will be charged 125% of basic rate of the plan.
-
Staircase if outside roof & headroom will be charged 60% of buildup area.
-
Basic price means landed cost of the material at site (which includes tax, transportation loading and unloading etc.).
-
Curing of any item will be done for maximum for 7 days except for the roof which will be for 15 days.
-
Designs & drawings to be free with the provision for correction twice. After which INR 50 per sft would be charged on super built area.